Relocatable MRI center Frimley Park Hospital

MRI

United Kingdom

Back to overview

Lamboo Medical delivers a new Relocatable MRI center at the Frimley Park Hospital in the United Kingdom.

For our customer InHealth Limited we engineered and manufactured complete MRI Center accommodations which include MRI units, support unit and reception – administration unit.

Due to our patented sandwich construction we were able to build the complete MRI center out of extreme large units which can easily be connected on site.

The Lamboo Medical relocatable accommodations are designed to comply to the local building regulations and according to the Siemens MRI installation instructions.

Our unique way of building with corrosion free panels ensures excellent image quality.

The whole design of the project was realized in close cooperation with the customer and Lamboo Medical arranged the complete project package:

  • Engineering
  • Manufacturing
  • Transport with craning on site including safety RAMS documents
  • Installation and commissioning according to the BS Regulations

This solution complies to our 5-star quality standard.

The qualifications within this case are specified out below.

Reliability

To what extent does the medical performance match the environmental circumstances?
Lamboo Medical's in-house production process is innovative, using aircraft technology to avoid "moving walls" around the Mobile MRI. Numerous other external factors impact the operation of the medical accommodation. Due to Lamboo Medical's track record of success on all continents worldwide, our team is eager to assist you in transforming the solution into a dependable medical accommodation for treating patients.

Operational

To what extent does the medical environment fit your needs?
Lamboo Medical advises on the necessary options to meet all codes and regulations.
To what extent does the medical performance match the environmental circumstances?

Lamboo Medical has manufactured the relocatable accommodation with the integration of a high insulated material which is combined with magnetic shielding. This high insulation has several advantages which help our CO2 2030 goal;

  • Using less energy due to the high insulation
  • No Aluminum which results in no paintwork
  • 15 + 15 years can be realized with this unit
  • Light solution to transport, resulting in less fuel and preparation on site